Veraform Studio emblemVERAFORM
STUDIO
Pricing a Refacing Job: The Margin Math Nobody Publishes
VERAFORM JOURNAL

Pricing a Refacing Job: The Margin Math Nobody Publishes

APRIL 01, 2026  ◆  3 MIN READ
IN SHORT

Refacing margins die from unpriced extras and vague labour, never from door costs. Structure the quote and the margin defends itself.

Refacing margins die from unpriced extras and vague labour, never from door costs. Structure the quote and the margin defends itself.

The quote skeleton

Fronts priced per piece from the trade schedule; end panels, toe kicks and mouldings as their own lines; hardware supplied-or-by-client stated; labour as crew-days × rate. Clients accept structured numbers they can see.

Where margin leaks

Unsurveyed extra fronts discovered mid-job, appliance panels nobody measured, disposal runs, and 'while you're here' hinges on cabinets outside scope. The survey day and a written scope line close every leak.

The anchor move

Quote alongside the alternative: full replacement at 3–4× with weeks of disruption. Refacing at a structured price with factory-lacquered fronts sells itself against that anchor — our contractors close a majority on the first visit with catalog in hand.

MORE IN FOR CONTRACTORS

Frequently asked

What margin do refacing contractors run?

Structured quotes on trade-priced fronts commonly hold 40%+ blended margin including labour.

Can clients choose doors from your catalog directly?

Yes — the printed and online catalog is built for exactly that kitchen-table decision.

‹ BACK TO THE JOURNAL
READY TO PRICE A PROJECT?

Seriously competitive lacquer. Same-week quotes.

REQUEST TRADE PRICING