Sequencing Cabinet Doors Across Multi-Unit Projects
VERAFORM JOURNAL

Sequencing Cabinet Doors Across Multi-Unit Projects

JUNE 30, 2026  ◆  3 MIN READ
IN SHORT

Multifamily rewards boring logistics. The winning move is kitting by unit, not batching by piece type.

Multifamily rewards boring logistics. The winning move is kitting by unit, not batching by piece type.

Kit by unit

Each unit's doors, panels and hardware pack ship as one labelled kit matching one schedule page. Crews install from a single cart, and a damaged piece names its unit instantly. Piece-type batching saves factory minutes and costs site days.

Colour discipline

Lock one batch per colour per phase; record batch line on every schedule. Unit 3's future touch-up should never be a guess. Upgrades ('accent island, units 12–18') get their own schedule pages, not margin notes.

Paper that scales

One master schedule, per-unit pages, phased delivery dates matched to floors, and a single change-order lane. Our trade program prices the whole matrix with volume tiers across phases — pooled, not per-drop.

MORE IN FOR CONTRACTORS

Frequently asked

Can deliveries be phased by floor?

Yes — phased, unit-kitted delivery is standard for multifamily trade orders.

Do volume tiers pool across phases?

Yes — project volume prices as a whole even when produced and delivered in phases.